Bathroom Showers |
All structures are subject to varying degrees of movement and the trouble to which the tradsman goes to accomodate that movement will determine the outcome of the job.
Large expanses should be broken up into sections with movement joints allowed so that sections of tiling do not exceed about three metres in each direction. It should be remembered that natural stone and ceramic tiles have different rates of expansion from the structure to which they are beind applied an therefore the separation is an advantage and helps overcome the tendency to crack.
Structural movement mostly occurs along predictable lines and within areas of high stress.
Joints which have been designed into concrete slabs should have a corresponding movement joint included. Where large areas join smaller areas there should be provision for differential movement.
|
 | Flexible PVC sheeting All components are fabricated from flexible PVC ... |
|
 | Full floor cover The entire area is completely............ |
|
 | Custom made tray The April shower tray is......... |
|
 | Floor waste drain The shower tray has a moulded connection............. |
|
 | Wall membrane The wall membrane fully protects and........................ |
|
 | The internal hob Hobs are built inside the tray.................... |
|
 | Drainage connections All drainage connections are fully bonded to the................ |
|
 | Lifetime Warranty This unique system is ................. |
|